A descriptive method statement of how the project will be built safely. Pictorials of all the construction method, major temporary works (including the site set-up) and any formwork fabrication are also required.
Wildlife Observation Tower Construction Project.
Information
An extension to an existing cycle path is to be constructed at Gunners Park Shoeburyness Essex, as shown in Figure 1. Part of the work involves the construction of a bridge over a small inlet river. The full working drawings for the bridge are published on the Moodle EG5012 site. Note that due to the area being an SSSI the site compound and access routes will need to be carefully considered. To construct the works the inlet river will need to be temporarily dammed to provide a dry working area. No heavy plant over 9t can be used close to the bridge site without a hard-standing. See Figure 1 below for details.
You are required to prepare a set of detailed documents outlining your proposed construction works to build the project. You will then present them to the client with a view to securing the contract for the work. One student will act as the construction manager
Group Report
Section 1
A descriptive method statement of how the project will be built safely. Pictorials of all the construction method, major temporary works (including the site set-up) and any formwork fabrication are also required.
It has to be a construction method statements
Description of project & Outline the method of works.
Describe what you going to do, and the activities performed throughout the construction phase such as:
1. Formwork
2. Site set up
3. Reinforcement
4. Excavation
Pads
Binding
Backfill
Fix forms
5. Piers, concreting, access and plant
6. Bridge decks
Erect all pieces
Fabricating areas
7. Pylon
8. Launching Decks
Turfers
Fixing of plates and bridge bearings
Splice to join both decks
Assessment Criteria for Marking of the Submitted Documents
The Asessors’s marks will be based on the following weightings:
Logical & methodical approach of the construction methods proposed
Accuracy & consistancy of programming the works & efficient use of resources
Suggested References for Assignment
March C, (2017) ‘Construction Management – Theory & Practice’ Routledge, London
Chudley, Hurst, Greeno & Topliss (2012) “Advanced Construction Technology” 5th Edition, Pearson
Criteria
Indicative Content
Marks %
1
Logical & clear Method Statement
As an example but not exclusively; a descriptive method statement of how the project will be built, including a user-friendly bar chart programme & network diagram for the project indicating the critical activities and the activities with available float; details & pictorials of all temporary works and formwork fabrication required.